Location

Kelowna, BC

Description

SPIDER AGILE TECH - This existing warehouse building was a challenge from the start to the finish. The newly renovated office had to span between two mezzanine floor spaces that were built at two different heights off of the shop floor below. Through the use of Smed Constructive Solutions, we were able to design and build an interior that surprised most clients as they entered into it. The use of modular wall panels and raised modular computer flooring brought a solution to every challenge we faced.